Case Study: Seamless Connectivity for Malta’s Largest Event
Customer: SiGMA | Country: Malta
CONNECTIVITY TRANSFORMING EVENTS
SIGMA is Malta’s largest and most high-profile event, drawing thousands of delegates, sponsors, and exhibitors from all over the world. In 2024, SIGMA faced its greatest logistical challenge yet: transforming MMH Malta Ltd, an active shipyard with no built-in
infrastructure, into a modern conference venue capable of hosting more than 27,500 delegates across 40,000 square metres.
Reliable connectivity was not just a nice-to-have, it was critical. Every exhibitor relied on Wi-Fi to power interactive displays, showcase products and deliver a smooth digital experience to visitors. After previous years where connectivity fell short of expectations, SIGMA knew that failure was not an option. The organisers needed a trusted partner to deliver flawless internet access, both wired and wireless across the entire venue, despite the complex environment.
Smart Technologies rose to the challenge, working in close collaboration with SIGMA and leveraging over a decade of partnership with Ruckus Networks. As the only Ruckus Elite Partner in Malta, we had exclusive access to top-tier engineering expertise and support, which proved critical to the event’s success. The team designed and implemented a robust infrastructure tailored for high-density, high-demand environments, including high-performance Ruckus access points, SmartZone controller technology, and AI-powered network monitoring to enable rapid adjustments on the fly.
The result? Seamless connectivity throughout the event, with zero complaints from delegates, exhibitors, or sponsors. Smart Technologies not only met SIGMA’s expectations but set a new benchmark for what is possible when technology and event
operations work hand in hand.
NEEDS:
- Transform an operational shipyard into a connected conference venue
- Provide reliable high-speed connectivity for 27,500+ delegates
- Enable seamless digital showcases across 40,000 sqm
- Overcome complex structural barriers
- Deliver setup within 6-7 days
CHALLENGES:
- No pre-existing infrastructure
- Disruptive venue structure (metal sheds, high ceilings)
- Short deployment window
- Prior connectivity failures increased pressure
- 18,000 metres of cabling to be installed in 7 days
SOLUTIONS:
- Designed and deployed a Ruckus Network solution using SmartZone controller, directional antennas and access points
- Ruckus AI for real-time monitoring
- Optimised deployment planning using advanced tools such as Ekahau to conduct predictive and post-deployment site surveys
- Required adjustments during the event
- Ruckus Networks infrastructure designed to handle high density and high co‑channel interference
RESULTS:
- High throughput and low latency during the event
- Zero connectivity complaints
- Full venue coverage (wired and wireless)
- Seamless operation for exhibitors and sponsors
- New standard for event connectivity
WHAT OUR CLIENTS AND PARTNERS SAY:
- “For the first time, internet at SIGMA just worked. It wasn’t just a success — it was a game-changer.” – Gunther Micallef DeCesare, CLO, SIGMA
- “This project was such a success thanks to our experience, our team of engineers, and the collaboration we had from the client.” – Manuel Aquilina, COO, Smart
Technologies - “Giving internet, both wirelessly and wired, seamlessly it was an achievement on its own.” – John Spiteri, Head of Networks, Smart Technologies
- “The SIGMA project showcased how Ruckus technology delivers reliable, high-performance connectivity even in the most challenging environments. We are proud to have partnered with Smart Technologies on this landmark event.” – Matteo
Riserbato, Internal Partner Account Manager, Ruckus Networks